# Lee App Press Deluxe Primer Rail Assembly
## Tutorial Description:
###### https://rumble.com/v59yxut-lee-app-press-deluxe-primer-rail-assembly.html
### The Steps
- Remove Rail
- from the press
- two screws at #8-32 secure the rail
- Primer Gate
- the "nub" of the gate faces inward - so it can contact with the bottom of the slider
- Slider
- once installed the "door knob" should slide easily
- Primer Selector
- the slider should be "extended out" to provide clearance
- the "long leg" should be locate closest to "the slide".
- the slider should be "pushed back in" to help lock everything into place
- Bottom Trough
- locate the "horse shoe"
- this will insert under a small "lip" to secure the trough into place
- Install Rubber Band
- will provide additional integrity to "keeping everything together"
- install the rubber band to the right of the "screw hole". This will clear the action of 'the duck'
- Install the "escape lever" - I call it "the duck"
- it's easily installed will face away from "the circle" and "hang his neck over a small rod".
- Tower - officially it's called the Spring Deflector
- this too is easily installed
- the "long leg" faces inward/toward the left if viewed from the front of the press
- Primer Chute
- this is easily installed
- Fan Tray
- 'open' means the tray will open
- 'lock' will trap the primers from falling out of the tray
- 'on' will allow the primers to fall out of the tray freely
---
[[4 Jump Start Videos to get you Going]]